Auger Conveyor,Twin Shaft Screw Conveyor,Twin Shafted Screw Conveyor,Double Shafted Screw Conveyor Quantum Conveying Systems Yangzhou Co.,Ltd. , https://www.quantum-sino.com
**High Quality QGW Shot Blasting Machine for Cleaning Steel Pipes**
The QGW shot blasting machine is designed to clean the internal and external surfaces of steel pipes, removing rust, welding slag, and other impurities to reveal a metallic luster. This advanced equipment enhances the fatigue resistance of workpieces, improves paint adhesion, and ensures a cleaner, more durable finish.
**Key Features:**
- **Model No.:** QGW
- **Feature:** Non-Toxic
- **Condition:** New
- **Customized:** Yes
- **Brand Name:** Puhua
- **Size:** Customizable
- **Color:** Blue or Customized
- **Material:** 20% High Chrome, ZGmn13, Mn65, etc.
- **Exported Countries:** USA, Russia, Australia, UAE, Mexico, etc.
- **After-Sales Service Provided:** Engineers available for overseas service
- **Warranty:** 1 Year
- **Control System:** Siemens, Fanuc, PLC, IPC, etc.
- **Trademark:** Puhua
- **Transport Package:** Standard Container
- **Specification:** CE, Sa 2.5
- **Origin:** Shandong, China (Mainland)
- **HS Code:** 84243000
**Application:**
The QGW series cleaning machine is ideal for various diameters of steel tubes. It is widely used in petrochemical engineering, steel manufacturing, district heating, water treatment, and more.
**Advantages:**
- Designed for cleaning the outer surface of steel pipes and tubes
- Floor-mounted "BE" air wash separator for easy observation and maintenance
- Blast chamber and floor are manganese-plated for long-lasting performance
- Fully automatic design for high-volume production and cost-effective operation
**Structure:**
The machine consists of a blasting chamber, blast wheel assembly, roller conveyor, abrasive recycling system (Screw Conveyor, elevator, separator), dust removal system, and electric control system. Each component is built for durability and efficiency.
**Trade Information:**
- **MOQ:** 1 set
- **Currency:** USD, RMB, EUR
- **Payment Terms:** 30% deposit via T/T, balance before delivery or L/C at sight
- **Delivery Time:** 15–40 days depending on the model
**Certificates:**
Our products are certified with CE, Sa 2.5, and other relevant standards to ensure quality and safety.
**After-Sales Service:**
- We provide installation and commissioning support with 1–3 technicians sent to your site. You cover travel, accommodation, and meals.
- Warranty period: 12 months from commissioning completion, not exceeding 18 months from delivery.
- Full English documentation provided, including installation drawings, wiring diagrams, and maintenance manuals.
- Experience in exporting to over 30 countries, including the USA, Russia, UK, UAE, Brazil, and more.
- High-quality spare parts made with 20% High Chrome, ZGMn13, Mn65, etc.
**Factory Layout & Customers:**
Visit our Qingdao factory to see how we manufacture these machines. Our clients include leading companies across the globe, and we have a proven track record of delivering reliable, high-performance equipment.
**FAQ:**
1. **Production Time:** 20–40 days depending on the model.
2. **Installation & Commissioning Time:** 10–15 days.
3. **Installation Support:** We send 1–2 technicians to assist, with customer covering their expenses.
4. **Warranty:** 12 months from commissioning, up to 18 months from delivery.
5. **Payment Terms:** 30% prepayment, 70% before delivery or L/C at sight.
6. **Documentation:** Full English manuals, drawings, and technical guides included.
Welcome to visit our factory in Qingdao!
**Cell:** +86 157 6427 9479