This year, Changsha will optimize and adjust 30 bus lines, increase 647 pure electric buses, and cancel 8 bus lines. The Changsha Municipal Transportation Bureau held a 2016 work meeting today to clarify the opening of the 13th Five-Year Plan. The goal of the elderly sand transportation development. This year, Changsha will speed up the construction of station hubs, the construction of trunk roads and the upgrading of rural roads, promote the construction of the north-south line, and implement the construction of “bus city”.

Will optimize the adjustment of bus lines 30

Liu Mingli, director of the Changsha Transportation Bureau, said that during the “Twelfth Five-Year Plan” period, Changsha completed a fixed asset investment of 43.961 billion yuan, 1.63 times that of the “Eleventh Five-Year Plan”. During the “Thirteenth Five-Year Plan” period, it is expected to invest 90.733 billion yuan, build 127.3 kilometers of expressways, build and renovate 1232 kilometers of trunk roads, build 6111 kilometers of rural roads, and promote the construction of Changsha Port Xia Ning Port Area, Tongguan Port Area and Passenger Port Area. We will build intelligent transportation projects such as information service and collaborative management system for the comprehensive passenger transportation hub of Changsha Railway South Station (Lito), and strive to build a “national comprehensive transportation hub” city and “bus city” to form a “customer-friendly, cargo-friendly” The comprehensive transportation system of the flow.

This year, it will speed up the construction of station hubs, the construction of trunk roads and the upgrading of rural roads, and implement the construction of “bus city”. Liu Mingli said, “This year, 30 bus lines will be optimized and adjusted. At the same time, 100 port-type bus stations will be coordinated and reconstructed. A new 100-kilometer bus lane will be added. In the integration of Dalu network, the construction of trunk roads will be accelerated, and projects such as the North-South Transverse Line, Huangjiang Highway, Jinyang Avenue, Yuening Avenue and Changxiang Expressway Wushan Interconnection Line will be promoted."

Cancel the CMB route, the bus will extend into the village

Changsha currently has 453 pure electric buses. This year, 647 new pure electric buses will be added and replaced in batches. At the same time, “customized buses” will be launched to introduce timing, fixed-point and orientation for special parks and institutions. bus. Lei Yihua, director of the Passenger Transport Management Office of the Changsha Transportation Bureau, said, "At present, the proportion of electric buses in Changsha is not high. If more than 600 new ones are added this year, more than 1,000 pure electric buses will be in China. The city should be relatively advanced. In the future, bus lines will be extended to some undeveloped villages or urban-rural junctions."

Lei Yihua introduced that in the past, the urban-rural junctions were mainly rural passenger transport, which was the CMB. Now, according to the needs of urban development, some have already become the main streets and offices in the five districts, such as “jumping horses” and “暮云" and so on.

In order to achieve equalization of urban and rural passenger transport, the municipal party committee and municipal government has formulated a plan for the transformation of urban and rural public passengers. The scope of the renovation involves some major townships within 20 kilometers of the main city, such as: Huang Xing, Vaulting Horse, Jinyun, Pingtang, Ting In towns and towns such as the Bay, public transport will be carried out within 3-5 years. "This year, eight CMB lines will be cancelled and rebuilt. During the year, there will be no CMB operation within the South and North Second Ring Roads."

Automatic Folding Box Machine

Folding Box Machine,High Speed Folding Box Machine,High Speed Automatic Cartoning Machine,Automatic Folding Box Machine

Dongguan City Li you machinery and Equipment Co., Ltd. , https://www.gdliyou.com